Installations

Overview | Application Data Sheet | Installations | Sub Sea | MPP Literature | Systems Layout | Videos | Contacts

Crescent Point, Calgary, Canada
L4MK 144-72, Operating in Shaunavon, Saskatchewan, Canada – Installed in 2011

 

 

 

 

 

 

 

 

Aera Energy, Bakersfield, CA
L4MK 280-145, Operating in Belridge Production Area – Installed in 2005

 

 

 

 

 

 

Hilcorp Alaska
L4HG 150-063, Operating in Alaska, Swanson River, North End Gathering – Installed in 2013

 

 

 

 

 

 

Petrobras, Brazil
L4HG 186-96, Operating in UO-SEAL Carmopolis Field – Installed in 2016

 

 

 

 

 

Ridgelake Energy, Metarie, LA
L4MK 280-143, Operating offshore in the Gulf of Mexico, Ship Shoal 150C – Installed in 2007

 

 

 

 

 

 

Chevron USA, New Orleans, LA
L4 HK -365-175, Operating in Gulf of Mexico, MP59A – Installed in 2007

 

 

 

 

 

 

Devon Canada Alberta, Canada
L4MK 140-88, Operating in Ferrier 10-26, Western Alberta – Installed in 2004

 

 

 

 

 

 

 

 

Esso Chad Development Chad, Africa
L4HK 330 – 100 to L4HK 330 – 214 – Installation in 2003/2004

 

 

 

 

 

 

Pemex Mexico
L4MK 410-200, Operating at Ku Maloob-Zaap РInstalled in 2012

 

 

 

 

 

 

Encana, Piceance Creek, CO
L4MG 140-031, Portable Blow Down Unit (BDU) for gas well liquid unloading. – Installed 2013

 

 

 

 

 

 

Crosby Creek Oil & Gas LLC, MS
L4MG 200-59, Operating in Millry, AL – Installed in 2016

 

 

 

 

 

Shell Canada
L4 MK 240-112, Operating in Peace River, Alberta, in cyclical steam oil production – Four pumps installed in 2007

 

 

 

 

 

 

 

 

Petrobras, Brazil
L4HK 330-70 – Installed in 2009

 

 

 

 

 

 

Pemex, Mexico
L4MG 240-62, Operating offshore in the Tekel field, Gulf of Mexico – Installed in 2016

 

 

 

 

 

Conoco-Phillips, OK
L4MK 82-40, Operating in Medford, Grant County, OK – Installed in 2012

 

 

 

 

 

 

 

Crescent Point, Calgary, Canada
L4MG 164-80, Operating in the the Weyburn, Bakken shale area, Saskatchewan, Canada

 

 

 

 

 

 

Pemex, Mexico
L4MG 240-85, Operating offshore in the Ayatsil A-C field, Gulf of Mexico – Installed in 2015

 

 

 

 

Crescent Point, Calgary, Canada
L4MG 240-110, Operating in the Weyburn area, Saskatchewan, Canada – Installed in 2013 – 2015

 

 

 

 

 

Sonatrach, Algeria
3 * L4MG 164-40, 2 * L4MG 200-92, Operating in the GSA 112/12 field, Algeria, – Installed in 2013

 

 

 

 

 

Lightstream Resources, Calgary, Canada
L4MG 240-110, Operating in Drayton Valley, Alberta – Installed in 2014