|

|
Multiphase Pumps
Installations
|
Crescent Point, Canada
L4MK 144-72
Operating in the Bakken play,
Saskatchewan, Canada
Installed in 2011
Total flow 38000 BPDe, 90% GVF
Pressure boost 130 PS!, 3600 RPM
300 HP Drive
|

|
|
Area Energy, Bakersfield, CA
L4MK 280-145
Operating in Belridge Production Area
Installed in 2005
Total flow 130,000 BPDe, 39 % GVF
Pressure Boost 190 PSI, 1750 RPM
800 HP Drive
|

|
|
Bonavista Energy Trust, Canada
L4NK 140-71
Operating in Spirit River, Alberta, Canada
Installed in 2004
Total flow 22,000 BPDe, 94 % GVF
Pressure Boost 150 PSI, 1750 RPM
150 HP Drive
|

|
|
Legacy Oil&Gas, Canada
L4MK 82-40 Operating in Turner Valley, Alberta, Canada on casing gas pressure draw down for
improving pump jack up-time.
Installed in 2005.
Total flow 4200 BPDe at 100 % GVF with
recirculation. VFD controlled 25 HP electric motor drive.
|

|
|
Century Exploration, Metarie, LA
L4MK 280-143
Operating in the Gulf of Mexico, Ship Shoal 150C
Installed in 2007
Total flow 132,100 BPDe, 95 % GVF
Pressure Boost 250 PSI, 1800 RPM
820 HP with gas engine drive
|

|
|
Chevron USA, New Orleans, LA
L4 HK -365-175
Operating in Gulf of Mexico, MP59A
Installed in 2007
Total flow 152,100 BPDe, 95 % GVF
Pressure Boost 640 PSI, 1200 RPM
2700 HP with gas engine drive
|

|
|
Devon Canada Alberta, Canada
L4MK 140-88
Installed in 2004
Operating in Ferrier 10-26
Western Alberta
Total Flow 22,000 BPDe, 95% GVF
Pressure Boost 231 PSI, Speed 2200 RPM
125 HP Drive
|

|
|
Esso Chad Development Chad, Africa
L4HK 330 - 100 to L4HK 330 - 214
Installation in 2003/2004
Flow up to 150 800 BPDe, max 56% GVF
Pressure Boost up to 840 PSI, 1150 RPM
Max. Power 960 HP
|

|
|
Pemex Mexico
L4MK 410-200
To be Installed in 2011
Operating at Ku Maloob-Zaap
Gulf of Mexico, Mexico
Total Flow 510,000 BPDe, 97% GVF
Pressure boost 265 PSI, 1850 RPM
2500 HP Drive
|

|
|
HOCOL S.A. Colombia
L4MK 240-92
Installed in 2004
Operating at San Francisco 44
Neiva, Colombia
Total Flow 56,000 BPDe, 58% GVF
Pressure boost 430 PSI, 1750 RPM
700 HP Drive
|

|
|
Petrobras Brazil
L4HK 256-82
Operating offshore in the Moreia Field
for Petrobras
Installed in 1998
Total flow 61,000 BPDe, 88 % GVF
Pressure Boost 580 PSI, 1750 RPM
800 HP Drive
|

|
|
Shell Canada
L4 MK 240-112
Operating in Peace River, Alberta
In cyclical steam oil production
Four pumps installed in 2007
Total flow 87,100 BPDe, 95 % GVF
Pressure Boost 300 PSI, 1800 RPM
600 HP Drive
|

|
|
Petrobras, Brazil
L4HK 330-70
Installed in 2009
Total flow 75,000 BPDe, 95 % GVF
Pressure Boost 940 PSI, 1750 RPM
1800 HP Drive
|

|
|

|